CECI in Vietnam

In 1994, CECI was the first international engineering consultant chosen to assist in Vietnam's economic development when it was selected to carry out the design and construction supervision services of a highway improvement section on Vietnam National Highway No. 5. The ROC-IEDF loan financed project proved to be a major success to both the Client and CECI in which CECI was honored for its performance of services, and has since then led to CECI's further expansion of consulting services in both northern and southern Vietnam.

The economic development of Vietnam is presently progressing at a very rapid rate and throughout this exciting period of modernization CECI has been providing its technical assitance in a number of projects, and at the same solidified an especially strong and amiable relationship with our clients and partners in the region. Listed below is a brief summary of some of our major project experience.

MAJOR PROJECT EXPERIENCE

Name of Project:

Name of Client:

Period of Service:

Type of Services:

Location:

Yen Vien – Lao Cai Railway Upgrading Project

Railways Project Management Unit, Ministry of Transport

December 2008 to On-going

Detailed Design and Construction Supervision

Kunming – Haiphong Transport Corridor

The Hanoi – Lao Cai railway is part of the Kunming to Haiphong transport corridor, which plays an important role in regional and international trade. The railway connects Vietnam's mountainous border provinces in the West with the midlands and Red River plains towards Hanoi.
This ADB and AFD funded project aims to increase the safety and decrease the time of operation by upgrading and rehabilitating the existing railway line for its length of approximately 285 kilometers so as to meet the requirements of transport demand. The main work includes (1) Feasibility Study Review, (2) Establishing Methodology for Survey and Design, (3) Survey and Investigation, (4) Detailed Design, (5) Assistance in tendering and procurement of rail and (6) Construction Supervision.

Name of Project:

Name of Client:

Period of Service:

Type of Services:

Location:

Vietnam Vinh Phuc Province Industrial Park Development Project

Compal Electronics Inc.

October 2007 to On-going

Planning and Detailed Design

Vinh Phuc Province, Northern Vietnam

The scope of work covers an area of approximately 326.9 hectares. The project planning is comprised of:

  1. Basic Environmental Analysis,
  2. Land Use Layout Plan,
  3. Traffic and Transportation Plan,
  4. Environmental Landscape Plan,
  5. Public Facilities and Public Utilities Equipment Plan and
  6. provision of all of the related engineering planning drawings.

The main work items for detailed design include:

  1. Grading (including the site grading plan and earthwork displacement plan),
  2. Road and bridge engineering works,
  3. Drainage and flood prevention engineering works,
  4. Water supply engineering works (including water distribution tank),
  5. Sewage engineering works,
  6. Power supply and communication conduit engineering works,
  7. Signaling, marking and road ancillary facilities,
  8. Street lighting engineering works,
  9. Parks, green belt and landscape engineering works, etc.

Name of Project:

Name of Client:

Period of Service:

Type of Services:

Location:

Mekong Transport Infrastructure Developmnent Project

Project Management Unit No. 1, Ministry of Transport

June 2005 to June 2006

Feasibility Study and Preliminary Planning

Mekong Delta

This Project aims to improve supply chain efficiency for the production, domestic and international trade of the Mekong Delta region. The main work includes:

  1. Review of existing reports and data.
  2. Social Impact Assessment of the project areas.
  3. Engineering studies and preliminary engineering design of alternative rehabilitation and upgrading alternatives of the road networks, inland waterways, inland ports and landing stages.
  4. Assessment of resettlement requirements of the studied alternatives.
  5. Feasibility analyses of the studied alternatives, including the estimation of financial, economic and social rates of return.
  6. Identify operational, administrative and managerial requirements to improve the efficiency of the investment.
  7. Design of institutional support to the Ministry of Transport.

Name of Project:

Name of Client:

Period of Service:

Type of Services:

Location:

Ho Chi Minh City to Phnom Penh Highway Improvement Project

Project Management Unit My Thuan, Ministry of Transport

October 1999 to June 2006

Design Review and Construction Supervision

Vietnam Component

The scope of this ADB funded project is the improvement of the section of Vietnam National Highway No.1 between Thu Duc and An Suong on the northern outskirts of Ho Chi Minh city (about 20km), and the section of Highway No. 22 between An Suong and Moc Bai on the border with Cambodia (about 58km). The works include improvement and widening of the existing road, partly through congested urban areas under heavy traffic, and the construction of a number of bridges of which 2 are long bridges, one over a waterway that carries significant traffic. Additional works include 2 interchanges, 5 flyovers, 2 bridges and 30km road widening.

Name of Project:


Name of Client:

Period of Service:

Type of Services:

Location:

Feeder Road Component of the ADB 2nd Road Improvement
Project

Project Management Unit No. 1, Ministry of Transport

November 1998 to February 2001

Technical Consulting Services and Construction Supervision

Five Provinces in Northern Vietnam

This ADB funded project, the Feeder Roads Component (FRC) of the Second Road Improvement Project, covers the improvement for selected lengths of about 600km of provincial, district, and possibly commune roads in Lang Son, Bac Giang, Bac Ninh, Cao Bang and Bac Kan Provinces. The component will be prepared and implemented by adopting a low-cost spot improvement approach in order to improve the reliability of road access to as large a propoortion of the provinces' populations as possible, while keeping costs low and maximizing the use of local resources.

Name of Project:

Name of Client:

Period of Service:

Type of Services:

Location:

Vietnam National Highway No. 5 Improvement Project

Project Management Unit No. 5, Ministry of Transport

May 1994 to December 1996

Design Review, Construction Supervision and Technical Advice

Hanoi-Haiduong-Haiphong (47K-62K) Section

This ROC-IEDF financed highway improvement section, 15km in length between 47K and 62K of Vietnam National Highway No. 5, consists of a 10km new alignment to serve as a bypass of Haiduong City and 5km of widening. There were three new bridges constructed, one crossing over the existing railway and two crossing rivers, totaling 773m in length.

vietnam