major
project experience |
Name
of Project: |
Mekong Transport Infrastructure Developmnent Project |
Name
of Client: |
Project Management Unit No. 1, Ministry of Transport |
Period
of Service: |
June
2005 to June 2006 |
Type
of Services: |
Feasibility Study and Preliminary Planning |
Service
Scope: |
Mekong Delta |
This Project aims to improve supply chain efficiency for the production, domestic
and international trade of the Mekong Delta region. The main work includes (1) Review of existing reports and data, (2) Social Impact Assessment of the project
Areas, (3) Engineering studies and preliminary engineering design of alternative rehabilitation and upgrading alternatives of the road networks, inland waterways,
inland ports and landing stages. (4) Assessment of resettlement requirements of the studied alternatives. (5) Feasibility
analyses of the studied alternatives,
including the estimation of financial,
economic and social rates of return.
(6) Identify operational,
administrative and managerial
requirements to improve the
efficiency of the investment
(7) Design of institutional
support to the Ministry of Transport. |
Name
of Project: |
Ho
Chi Minh City to Phnom Penh Highway Improvement Project |
Name
of Client: |
Project
Management Unit My Thuan, Ministry of Transport |
Period
of Service: |
October
1999 to June 2006 |
Type
of Services: |
Design
Review and Construction Supervision |
Service
Scope: |
Vietnam
Component |
The
Project scope is the improvement of the section of Vietnam National
Highway No.1 between Thu Duc and An Suong on the northern outskirts
of Ho Chi Minh city (about 20km), and the section of Highway No.
22 between An Suong and Moc Bai on the border with Cambodia (about
58km). The works include improvement and widening of the existing
road, partly through congested urban areas under heavy traffic,
and the construction of a number of bridges of which 2 are long
bridges, one over a waterway that carries significant traffic. Additional
works include 2 interchanges, 5 flyovers, 2 bridges and 30km road
widening. |
Name
of Project: |
Feeder
Road Component of the ADB 2nd Road Improvement Project |
Name
of Client: |
Project
Management Unit No. 1, Ministry of Transport |
Period
of Service: |
November
1998 to February 2001 |
Type
of Services: |
Technical
Consulting Services and Construction Supervision |
Service
Scope: |
Five
Provinces in Northern Vietnam |
This
ADB funded project, the Feeder Roads Component (FRC) of the Second
Road Improvement Project, covers the improvement for selected lengths
of about 600km of provincial, district, and possibly commune roads
in Lang Son, Bac Giang, Bac Ninh, Cao Bang and Bac Kan Provinces.
The component will be prepared and implemented by adopting a low-cost
spot improvement approach in order to improve the reliability of
road access to as large a propoortion of the provinces' populations
as possible, while keeping costs low and maximizing the use of local
resources. |
Name
of Project: |
Vietnam
National Highway No. 5 Improvement Project |
Name
of Client: |
Project
Management Unit No. 5, Ministry of Transport |
Period
of Service: |
May
1994 to December 1996 |
Type
of Services: |
Design
Review, Construction Supervision and Technical Advice |
Service
Scope: |
Hanoi-Haiduong-Haiphong
(47K-62K) Section |
This
ROC-IEDF financed highway improvement section, 15km in length between
47K and 62K of Vietnam National Highway No. 5, consists of a 10km
new alignment to serve as a bypass of Haiduong City and 5km of widening.
There were three new bridges constructed, one crossing over the
existing railway and two crossing rivers, totaling 773m in length. |